In cooperation with Managing Director Mads Justesen, LEDVANCE developed a proposal to replace all floodlights at the facility. The installation comprised 108 LED floodlights together with accessories such as special reflectors, base caps, mounting materials and safety wires. The project was developed with a focus on precise light control and the reduction of spill light and back light. The specific requirements of the stadium and its surroundings formed the basis of the design, resulting in a lighting solution using specially adapted variants with different optical and visor combinations.